What the production plan misses on the factory floor

No items found.

In the November 10 webinar Running on reality, SAP’s Sayan Bose and Guidewheel CEO Lauren Dunford discussed how machine-state data can help teams working in SAP Digital Manufacturing see what happened on the floor and make a better-informed production plan.

They worked through three questions that manufacturing teams can take into their operating reviews. How closely does the completed shift match the schedule? What could the plant do with the equipment it already has? And where should the team start measuring if it wants to improve output?

At a glance

Three decisions get easier when the production plan and the shift record tell the same story.

Compare plan and actuals Make sure an order’s status reflects what the machines ran and what the shift produced.

Check the capacity you have Review runtime and recurring stops before choosing another machine or shift.

Start with one constraint Pick a line, agree on a measure, and check the numbers with the people who run it.

Three takeaways from the webinar

1. Compare the production plan with what ran

Bose described two views of the same work. Customer orders and forecasts shape which products the plant plans to make, in what quantities, and on which equipment. On the floor, people can see when a machine started, how long it stopped, and how many good parts came out. Teams often have to connect those views manually, using shift notes, spreadsheets, and entries made after production ends.

What the ERP records
Work order, scheduled start, and target quantity.
What the shift records
Actual start, runtime, stops, and good units where available.
Sayan Bose on what the floor knows

Start with an order whose status affects the next scheduling decision. Put its planned start and target quantity beside the actual run window, the stops, and the good-unit count if the team has it. Ask the operator to walk through the largest difference. A changeover, a wait for materials, and a machine fault can all look like time lost in a schedule, and each points to a different action.

It helps to agree on where each piece of information comes from. Use the work order to identify the job, the machine record to see when it ran, and the operator’s account to explain a stop. If the shift report and the machine record disagree, resolve the discrepancy while the team still remembers the run. That gives the planner a better basis for deciding whether to move the next order. Guidewheel’s ERP integration playbook shows which machine signals to map to each work order.

Bose also pointed to timing in material consumption. When consumption is recorded later, the inventory shown in the system can differ from what the plant has on hand. It is another place where the gap can affect a decision, particularly when the next run depends on the same material.

2. Check capacity before buying equipment

Dunford discussed what manufacturers can learn from a small number of useful signals. Once a team can see when equipment runs and when it waits, it has a better starting point for judging capacity. Start with the data that would change the equipment decision. Scheduled hours, actual runtime, and recurring stoppages can all help frame that discussion.

Lauren Dunford on checking available capacity

Take one line under consideration for more capacity and review comparable shifts. Start with the time scheduled for production. Compare it with actual time spent making the relevant product and account for breaks, changeovers, and unplanned stops. Bring in output if it is available, so hours of activity can be read alongside what the line actually produced.

Then look for patterns that can be tested. If the line consistently waits for material, check when it runs out and how replenishment is triggered. A change to material delivery can be tested on the same line and measured against similar shifts. If the equipment is already running steadily and the order backlog is still growing, the runtime and output records can inform the case for additional equipment or another shift.

The comparison is most useful when the team can explain what it measured. A shift running a different product mix or carrying an unusual changeover load may tell a different story. Review the results with the people running the equipment before drawing conclusions about how much more work the line can take.

3. Start with one production constraint

Bose’s starting question was whether the team could tell what its machines were doing. From there, he suggested focusing on the constraint that matters most. For a plant team, that might be a line where a recurring stop holds up the next production step or prevents the shift from completing an order.

Sayan Bose on starting with one constraint

Pick a constraint that the team can observe and act on. Name the decision the pilot should inform, such as whether to change a replenishment routine or how to sequence changeovers. That decision gives the measurement a purpose and makes it easier to judge whether the pilot produced anything the next shift can use.

Check what happens to the work after it leaves that machine. The speakers noted that bottlenecks can move between machines, lines, and plants. A faster step can simply leave material waiting at the next operation. When you change the process, look at completed output for the line alongside the performance of the machine you changed. The guide to machine-level and line-level OEE shows how to tell which machine caused a loss and whether it cost the line good parts.

Bose went on to suggest three checks for the team reviewing the results. Are people looking at reliable data when they need it? Do they know the main reasons machines stop or underperform? Are changes on the floor producing a result worth carrying forward? Those checks tie together the measurements, the reason for collecting them, and the work someone can do next.

The discussion also returned to sharing what works across plants. Before comparing lines or sites, agree on what counts as scheduled time, a stop, and a good unit. Capture those definitions with the review notes. A second plant can then run the same check and explain differences in equipment, products, or schedules before applying the first plant’s approach.

Run a one-line pilot

Choose one line, one work order, and one representative shift. Record the planned start and target quantity. Ask the planner what decision is getting held up and agree on what evidence would help them make it.

At the end of the shift, compare the plan with the actual start, runtime, stop times, and good units where those are recorded. Review the longest stop with the operator. Note the reason if it is known and mark any gaps the team still has to investigate.

Use unplanned stop minutes per scheduled shift as a starting measure if recurring stops are the issue. Give one recurring cause an owner and agree on an action for the next comparable shift. At the next review, compare results using the same measure and check whether the action addressed the cause you saw.

Bring the results to an operating review the team already attends. Keep the initial record, the action, and the follow-up together. If the team can explain what changed, take that record to the next line or site so it can repeat the check under its own production conditions.